Colo cage design for data center consultants

Plan the whole colo cage, from floor plan to cable label.

Lay out the cage, cabinets and racks, A and B power, cable pathways, structured cabling and labels in one project. Then hand your installer the drawings and schedules to build it.

  • Cage and aisles
  • Cabinets and racks
  • Devices by RU
  • A and B power
  • Cable pathways
  • Structured cabling
  • Labels
  • Installer pack

The demo is a sample cage. Sign in with your email to get a one-time code. Or watch the narrated tour first, in short clips.

Floor plan of a sample cage with four rows of cabinets between hot and cold aisles, with overhead ladder rack and fiber pathways.
Planned to published standards
  • TIA-942-C
  • TIA-606-D
  • TIA-568
  • IEEE 802.3
How we use them

Everything inside the cage

Every part of the cage, planned in one place.

Most teams juggle a drawing tool, a rack spreadsheet, a cable list and a label file. Ampora DC keeps them in one design, so a change in one place shows up everywhere.

How it works

  1. 1

    Room and aisles

    Draw the cage, its columns and its hot and cold aisles.

  2. 2

    Cabinets and devices

    Place each cabinet, set its front, and fill it RU by RU.

  3. 3

    Power

    Add PDUs and give every device its Leg A and Leg B feed.

  4. 4

    Pathways and cabling

    Lay out trays, then connect ports with the right cable.

  5. 5

    Labels and handoff

    Print labels and download the installer pack.

Cabinets and devices

Every cabinet, RU by RU.

Place a cabinet, set the way its front faces, then mount each device in its rack units, front or rear. Open space and crowded cabinets are easy to spot, and the same elevation goes into the installer pack.

  • Cabinet models from the catalog, with their sizes
  • Rails and mounting reviewed for every device
A01 · front · 42 RU
  • A01-PP42
  • A01-SW141
  • A01-SW240
  • A01-SRV0137-38
  • A01-SRV0235-36
  • A01-SRV0333-34
  • A01-SRV0431-32
  • A01-SRV0529-30
  • A01-SRV0627-28
  • A01-SRV0725-26
  • A01-SRV0823-24
  • A01-SRV0921-22
  • A01-SRV1019-20
  • A01-SRV1117-18
  • A01-SRV1215-16
  • A01-STO19-12
  • A01-STO25-8

Power

A and B power for every device.

Give each cabinet its PDUs and each device its Leg A and Leg B feed. Watts and VA stay separate, and a device with no power figure yet stays visible instead of being guessed.

  • Cabinet totals and any missing feed
  • Power by cabinet, ready for the electrician
Power by cabinet · A01
RUDevicePowerLeg ALeg B
42A01-PPnot setnonenone
41A01-SW1350 WA01-PDU-AA01-PDU-B
40A01-SW2350 WA01-PDU-AA01-PDU-B
37-38A01-SRV01650 WA01-PDU-AA01-PDU-B
35-36A01-SRV02650 WA01-PDU-AA01-PDU-B
+ 12 more devices
A01 total · 17 devices10,300 W + 1 not set

Pathways and structured cabling

Trays, connections and cables, end to end.

Draw cable tray, fiber tray, runway and conduit on the room plan, overhead or underfloor. Connect ports across the cage, and pick each cable type from suggestions that name their source and reach.

  • Copper and fiber, with connector types at both ends
  • Every length in metres and feet
Cable schedule · sample cage
FromToCable typeLengthTray route
A01-41:01A02-42:01Cat 6A · RJ453.0 m9.8 ftTray A
A01-40:05B01-40:05OM4 fiber · LC10.0 m32.8 ftTray A, Spine tray, Tray B
A02-41:49A01-40:02OM4 fiber · LC4.0 m13.1 ftTray A
B03-41:49B01-40:03OM4 fiber · LC4.0 m13.1 ftTray B

Labels

Labels named the way installers expect.

Every cabinet, panel, port, cable and PDU gets a TIA-606 name from the design itself, so the label always matches the drawing. Cables show both ends, near end first.

  • Wrap, flag and tag styles
  • Import files for Panduit, Brady, DYMO and Brother label software
Cable, near endA01-35:05B04-20:05
Cable, far endB04-20:05A01-35:05
Panel ports010203040506
CabinetA01
PDUA01-PDU-ALeg A

Installer pack

Hand the crew what they need to build it.

Download one printable PDF with a title block on every sheet, plus plain spreadsheets the crew can sort and check off. Cable lengths show metres and feet on every row.

It is a design package for review: every sheet is marked not for construction.

PDF
Installer pack

Floor plan, elevations, cable schedule and power, US Letter

PDF · SVG
Floor plan

To a stated scale, dimensions in m and ft-in

PDF · SVG
Cabinet elevations

Front and rear, every device in its rack units

PDF · CSV
Cable schedule

From and to, cable type, connectors, length, tray route

PDF · CSV
Power by cabinet

Leg A and Leg B PDU for each device, cabinet totals

CSV
Cabinet list and devices by cabinet

Positions, sizes, rack units, faces

Built on industry standards.

The room plan, connection names and cable type suggestions follow the published standards that installers and colocation providers already use.

  • TIA-942-C

    Room layout

    Cabinet fronts face a cold aisle and their backs a hot aisle, the arrangement the standard sets out.

  • TIA-606-D

    Names and labels

    Each connection is named by its two ends: cabinet, rack unit and port, such as A01-35:05 to B04-20:05.

  • TIA-568 · IEEE 802.3

    Cables

    Cable type suggestions come from the standards, each with its reach and source. For example, 10GBASE-T runs up to 100 m on Cat 6A.

Each cable type suggestion names its source and reach, and you can change it. TIA and IEEE publish these standards; they have not certified or endorsed Ampora DC. Printer manufacturers are named only to show which label files the app writes.

See it with a sample cage.

Open the demo and plan a few racks yourself, from the room to the labels. It resets every night.