Tour
See Ampora DC, one step at a time.
Watch a sample cage go from an empty room to an install checklist. Each short clip covers one part of the app, with narration and captions. Watch them in order, or jump to the part you care about.
Recorded in the demo with made-up sample data. The narration is an AI-generated voice.
01 · 1:24
Start a project
Pick your units, name a project, and see where to go next.
Next: Room and cabinets02 · 1:50
Room and cabinets
Draw the cage, mark aisles, then drag cabinets onto the plan.
Next: Devices and rack units04 · 0:49
Power
Plan A and B feeds for every device, with watts and VA kept apart.
Next: Connections and pathways05 · 2:38
Connections and pathways
Draw a cable tray, connect two devices, and size the cable in feet or metres.
Next: Rack patching06 · 0:42
Rack patching
See every port and patch cord on the rack view, with each port's far end and cable.
Next: Heights and stacking07 · 1:28
Heights and stacking
Enter the ceiling height, then say where each run sits: over which side of the cabinets, how high, how it hangs, and what it is stacked on.
Next: Catalog09 · 0:54
Bill of materials
See what the design needs, then add a missing item.
Next: Review and downloads10 · 0:58
Review and downloads
See what still needs work, then download the draft design package.
Next: Labels12 · 0:37
Install
Issue the design to your install crew and follow their progress.
Next: Infrastructure design13 · 1:43
Infrastructure design
Start with Project Information, pick modules, and build from your answers.
Next: Build a parts list
Try it with a sample cage.
The demo resets every night, so build whatever you like.